| front elevation during demolition |
| living room taken down to the original wood studs and floor joists |
| excavation for rear addition |
| concrete footing for new addition |
The re-construction is moving along....we are aiming for a fall completion.
| front elevation during demolition |
| living room taken down to the original wood studs and floor joists |
| excavation for rear addition |
| concrete footing for new addition |